ridume2020 ridume2020
  • 02-01-2024
  • Mathematics
contestada

Montu finishes a piece of work in 24 days. How much work will he complete in 8 days?​

Respuesta :

ahmedmaham984
ahmedmaham984 ahmedmaham984
  • 02-01-2024

Answer:

Therefore, he will complete 1/3 of the work in 8 days as 24 ÷ 8 = 3.

Answer Link

Otras preguntas

QUESTION 32 If you were giving a speech about how to execute basic karate moves, the best kind of visual aid to use would pro yourself. a photograph. a chart. a
Cuales son los elementos comunicativos del instructivo
In Osmosis, a cell becomes turgid when it: A. expands from absorbing too much water. B. bursts from absorbing too much water. C. bursts from absorbing too much
Compute the total cost per year of the following pair of expenses. Then complete the​ sentence: On an annual​ basis, the first set of expenses is​ _______% of t
Find the volume of the solid obtained by rotating the region bounded by the given curves about the specified axis: y=x6, y=1 about y=6.
preposition " when the bull began to run ......... me , I jumped.......... the fence​
the LCM of 16 and 18 is
Which expression is equivalent to 3/2?
preposition " when the bull began to run ......... me , I jumped.......... the fence​
Read the two excerpts from Governor George Wallace's inaugural address. As Thomas Jefferson said, "The God who gave us life, gave us liberty at the same time; n