henriquefvboas68241 henriquefvboas68241
  • 01-08-2022
  • Business
contestada

In general, the production manager is responsible for the materials price variance. True or false?.

Respuesta :

PallasAthena23
PallasAthena23 PallasAthena23
  • 01-08-2022
False

In general, materials price variance is the responsibility of the purchasing manager, not the production manager.
Answer Link

Otras preguntas

Which equation will you use to calculate the volume of a 5.00 liter sample of air at 50°C when it is warmed to 100°C at constant pressure?
This theory was the driving force behind the Kennedy administration’s actions in Vietnam. What was it?
which type of eclipse makes the sun appear in the form of a ring
why go vegetarian? people choose to eliminate meat from their diets for many reasons. concerns about health risks, farming practices, and environmental problems
Line AB contains (0, 4) and (1, 6) Line CD contains points (2, 10) and (−1, 4). Lines AB and CD are A) parallel because the slopes are the same B) perpendicular
In which stage of alcoholism does the drinker face serious health problems? A: problem drinking stage B: dependence stage C: last stage
which set of numbers are ordered from least to greatest? 5, –5, |–2|, 3, –|2| –5, –|2|, |–2|, 3, 5 5, 3, |–2|, –|2|, –5 –|2|, |–2|, 3, –5, 5
what produces the largest amount of federal revenue in the united states?
How are evaporation and sublimation similar?
how do you identify the parts of a narrative arc?