nikolaungurian nikolaungurian
  • 03-03-2022
  • Mathematics
contestada


It takes 12 men 5 days to complete a job. Work out how many days it would take 3 men to complete the same job.

Respuesta :

Esther
Esther Esther
  • 03-03-2022

Answer:

20 days

Step-by-step explanation:

It takes 12 men 5 days to complete a job. Work out how many days it would take 3 men to complete the same job.

12 * 5 = 60

60/3 = 20

It will take 3 men 20 days to do the same job

Answer Link

Otras preguntas

How has the airplane changed over time?
which. of these men was a leading physition of the time and helped found the first american antislavery society
what is 0.1 10 times as much
what policy reasserted the U.S. position as protector of the Western Hemisphere
TRUE or FALSE ________A branch of a cladogram is called a clade.
Shawna has 3 adults 2 children coming over for dessert. she going to serve 2 small apple pies. if she plans to give each person, including herself,an equal amou
One side of an isosceles triangle has a length of 19 m. The lengths of the other two sides are equal to one another, but are unknown. If the perimeter of the tr
A carpenter needs to make 60 dowels. Each dowel must be 6 inches long. The wood from which the carpenter will cut the dowels comes in 4-foot lengths. What is th
57.4 divided by 10???????
What effect did the formation of the Society of Jesus have on the Roman Catholic Church?