Victoriacaulder4
Victoriacaulder4 Victoriacaulder4
  • 04-10-2021
  • History
contestada

What are the risks involved in choosing to build within one kilometer of a site such as Teotihuacan?

Respuesta :

zarampa
zarampa zarampa
  • 04-10-2021

Answer:

Explanation:

The risk is the cancellation of construction due to the high possibility of an anthropological find.

Another risk is the protests of people who feel offended by an alleged invasion of an ancestral territory.

Answer Link

Otras preguntas

A company's business purpose can also be referred to as the _____________ of the business when applying a strategic plan.
what Closely stacked, flattened sacs (plants only)
what is x? x^2+(x+1)^2=145
Amino acids are the monomers of this biomolecule. lipids nucleic acids carbohydrates proteins
The colossal heads are the most regonized symbol of The mayan Culture. True or False?
In your class, there are 12 students with brown eyes, 4 students with green eyes, and 3 students with blue eyes. What is the ratio of students with blue eyes to
The governmental roles in American life during the American revolution
rabbits population can double every 30 days if there are 10 rabbits on a farm how many rabbits will be on the farm after 120 days
Select the graph of the solution. Click until the correct graph appears. 3x + 1 < 7 (line graph)
Do only human-interest matter morally, or is the natural world intrinsically valuable? in your view, is our treatment of animals, in particular, factory farming