elizabethmorladza
elizabethmorladza elizabethmorladza
  • 01-09-2021
  • Mathematics
contestada

A piece of work takes 20 labourers to complete in 10 days. how many labourers will complete the same job in 25 days if they work at the same rate?​

Respuesta :

denimjackets23
denimjackets23 denimjackets23
  • 04-09-2021

Step-by-step explanation:

If 20 labourers=10 days

x labourers = 25 days

10x= 25×20

[tex] \frac{10x}{10} = \frac{25 \times 20}{10}[/tex]

Cancelling out by 10 on both sides

[tex]x = \frac{25 \times 2}{1} \\ x = 50 [/tex]

Therefore, it takes 50 labourers to complete the work at the same rate in 25 days.

Answer Link

Otras preguntas

9. An elevator on a construction site is being operated at rated capacity of 6 tons, and is supported by two standard steel cables, each having a cross-section
Which of these constitutional amendments made all people born or naturalized in the United States into citizens of the United States? (5 points)
pls pls pls pls pls pls pls pls pls
Hhheeeellpppp me pls quickly plssss
It is clear that Katniss is not in favor of another Hunger Games. She executes Coin to make sure it doesn't happen. Therefore, why did Katniss vote "yes" for an
Try These questions out and I’ll give you brainliest no links posted on My question or I will report you
Me when I look at my family
What does Darwin's controversial book, On the Origin of Species by Means of Natural Selection, illustrate? А the importance of variations in organisms B that tr
The rectangular pyramid below has a volume of 200 m3. What is the height of the rectangular pyramid in meters? If the base is 6 by 5 meters
Which of these are generally considered a household pet? A. Zebra B. Tiger C. Dog D. Elephant