A costing system that uses actual costs for direct materials and labor and predetermined overhead rates to apply overhead is called a(n)

Respuesta :

topeadeniran2 topeadeniran2
  • 07-07-2021

Answer: normal costing system

Explanation:

A costing system which uses the actual costs for direct materials and the labor and predetermined overhead rates to apply overhead is referred to as the normal costing system.

Normal costing system is the cost allocation method whereby cost is assigned to products which are based on the labor, materials, and the overhead which are used in their production.

Answer Link

Otras preguntas

"which are true statements about anaerobic respiration? check all that apply"
When the fed purchases government securities from a commercial bank, the bank?
How have these owls adapted to their nearly treeless environment?
4) Will Mark Brainliest + 10 points!
"during the expansion westward, tobacco was consumed mainly in what form?"
What is the formula for finding the diameter of a circle if you know the circumference?
________ believed that ideas in and of themselves generate social change and that modern capitalism would not have arisen without the protestant revolution.
"if the dollar appreciates because of speculation or government policy, the u.s. aggregate demand shifts _________ . u.s. aggregate demand shifts _________ if o
What is the simplified form of x 4/x^2-3x-10 times x-3/x^2 x-12?
__________ of drivers age 16-20 who admitted to driving after taking drugs felt that they were "not high enough to cause a crash."