A construction company delivered 40 loads of concrete in 5 days.

What was their rate of work?



A.




B.




C.




D.


Respuesta :

melhunt99
melhunt99 melhunt99
  • 05-11-2016
Well 40 divided by 5 is 8 and you don't have options so I would say 8 loads a day :)
Answer Link

Otras preguntas

Which of the following should occur when assessing a safety and health program’s effectiveness?a. Enforce safe work practices.b. Interview employees at all leve
A 12 pack of scented pencils sells.for $3.00 at the book store. What is the sales tax rate is the total cost of the pencils is $3.21
what punctuation make indicates possession?
how was the holy Roman Emperor's power limted
Which conquistador crossed the Mississippi River
What type of state did Elizabeth Tudor have religiously
I need to know the answer to : 1 1/2 x 2 1/4 = ?
A region that includes several interacting ecosystems is called ___
Which factor is most likely to reduce the carrying capacity of an otter population in a lake? A. Shortage of food B. Plenty of space C. Sufficient wate
Which electric component provides energy to the circuit of a flashlight? battery motor resistor switch