What technique is used when setup times at a workstation are sequence dependent?

Respuesta :

littleliax0618
littleliax0618 littleliax0618
  • 04-01-2021

Answer:

johnsons rule minimizes total idle time for both machines or work centers. What technique is used when setup times at a workstation are sequence dependent? determine the total time of each job sequence permutation considering the setup time and choose the best (lowest) time.

Explanation:

please mark me as brainliest thank you

Answer Link

Otras preguntas

mixed into the batter ( was or were) a dozen of the freshest eggs.
How many milliliters of water are in each 7 beakers
A(n) _____ is a hydrocarbon in which one or more hydrogen atoms is replaced by a -COOH and a -NH^2 group. HELP PLEASE! Please explain.
Who is William lots garrison
estimate the product of 15.217 × 9.54
A regular square pyramid has a base length of 6 cm. The slant height of the pyramid is 9 cm. What is the surface area of the regular pyramid? a. 90 cm2 b. 120
How do thermostats work?
What is x^2+x-20=0. please help
Dominic and Stacy each have a stamp collection. Dominic has six fewer stamps than three times the number of stamps Stacy has. Dominic and Stacy decide to give a
why is cobalt placed before nickel on the periodic table of elements even though it has a higher average atomic mass than nickel