IUlawyer8169 IUlawyer8169
  • 01-01-2021
  • Business
contestada

When multiple teams work together on the same product each team should:_____.

Respuesta :

Parrain
Parrain Parrain
  • 03-01-2021

Answer: B. False

Explanation:

A product backlog is the list that records the improvements to be made to a product.

Teams operating separately should not have multiple backlogs but should have one so that when the team mean to develop the product looks at the backlog, there is one single authoritative file instead of multiple ones that could complicate things.

Answer Link

Otras preguntas

can you see the picture?
The expression 4x gives the perimeter of a square with a side length of x units. what is the perimeter of a square with a side length of 5/7 units?
In order to increase the amount of water available for human consumption in the Middle East, most governments have been forced to reduce the amount of _________
All the world is a stage, and all the men and women merely players metaphor personification simile
How do we represent real-world problems involving ratios and rates with tables and graphs? Explain
i need help on subtracting fractions
Except for the amount of __________, plasma and interstitial fluid differ little in composition.
Kendall scored 3 times as many points as Abdul scored in a basketball game. Otis scored 5 more points than Abdul scored. The three players scored 45 points all
78% of 64 is what number
The __________ approach to moral development consists of identifying different ways one can behave in situations that will benefit oneself without harming other