The method of dividing the project scope into many parts that, when combined, would constitute the project deliverable is called _____:

Respuesta :

gomezgerman032 gomezgerman032
  • 04-01-2020

Answer:

decomposition

Explanation:

This is a technique used to divide and subdivide the scope of the project and the future to deliver, in smaller and more manageable parts. It is defined what work is going to be done and which is not. It is a hierarchical decomposition oriented to the deliverable product of work and achieve the objectives of the project.

Answer Link

Otras preguntas

Which of the following expressions could be used to represent "the difference between -17 and -8"? -8 - (-17) -17 - 8 -17 - (-8) -8 + (-17)
what challenges do students face while writing
How did the crop lien system continue to drive farmers into debt
How are continental glaciers diffrent from valley?
What minus 53 equals43?
What is the LCM of 24a^3 b and 36ab^2? 12ab 24a 3b^2 36ab 72a 3b^2
How many times does 22 go into 160
Read the excerpt from "Politics and the English Language" by George Orwell. Defenseless villages are bombarded from the air, the inhabitants driven out into the
what day of the year does a presidential term in the United States begin and end? a. July 4thb. December 31stc. January 20thd. November 11th
The price p of a pizza is $6.95 plus $.95 for each topping t on the pizza