mariabello939 mariabello939
  • 04-01-2020
  • Business
contestada

A planning budget based on a single predicted amount of sales or production volume is called a:

Respuesta :

andromache andromache
  • 05-01-2020

Answer:

Fixed budget

Explanation:

As the name suggests, the fixed budget is that budget in which the sales or production volume remains the same plus it is based on the planning budget.  

This is also known as the static budget. The activity level remains constant plus it does not change in business fluctuations. All the items in this budget would remain same like - sales, sales commission criteria, and all other items

Answer Link

Otras preguntas

When an oxbow becomes completely cut off from the main river, it is called an _____?
What does it mean for a reflection to be universal?
What’s the missing part, fraction you’re answer
Which of the following is another word for apparition? A. Convict B. Benefactor C. Thief D. Ghost
Which laws or rules prevent or reduce injury by preventing crashes? A. Motorcycle helmet laws B. Child seat laws C. Impaired-driving laws D. Seat b
the top part of a fraction represents part of the whole
What invention that was made durong the victorian era would be helpful to the people living during that time and why? What did it do? Why was it important? Sinc
60000ft² divided by 3 floors and 2 buildings is? How much each floor for each building?
Elizebeth loves road trips and last summer she took two. On her first trip she spent $226 on a rental car which she rented for 4days and traveled 350 miles. On
The African nation of Nigeria can be found _____.