ashley902872 ashley902872
  • 02-11-2019
  • Mathematics
contestada

Mr. Piper's plumbing needed
repairs. The plumber charged
$98 for parts plus $45 per hour
for labor. If the bill totaled $458
how many hours of labor were
required?

Respuesta :

LilRat0
LilRat0 LilRat0
  • 02-11-2019

Answer:

458/143=3.20 so it should be 3.20 hrs

Answer Link
ajsagiriusoxcutf
ajsagiriusoxcutf ajsagiriusoxcutf
  • 02-11-2019

Answer:

(458-98)÷45 = number of hours required

Answer Link

Otras preguntas

What are the main causes for seasons on earth?
56 out of 128 students went on a trip during vacations what percent of students went on trips
write algebraic expression 17 less than the product of 3 and m
Which renewable resources could become a non renewable resource if used faster than earths ability to replenish its supply?
order least to greatest 100% 1/100 0.001% 1/10 0.001 1.1 10 10,000/100
If 2 is added to seven times a number and equals 8 more than six times a number what is the number
Can some one help me? Please!
what is 72.1 repeating as a fraction
Castor brought 6 3/4 small carrot cakes to share with 26 students in his class. Did Castor bring enough for each student to have 1/4 of a cake? (Yes..26 studen
How do you solve this two step equation 6=a/4+2